Sign In | Join Free | My spintoband.com |
|
Brand Name : Ruixin
Model Number : 2inch ID 3inch ID 4.06inch ID 5-1/8inch ID
Certification : API
Place of Origin : China Baoji
MOQ : 1
Payment Terms : T/T
Supply Ability : 1 set 3 weeks
Delivery Time : 3-4 weeks
Packaging Details : Wooden Box
Name : Blowout Preventer BOP Wireline Pressure Control Equipment
Material : Alloy Steel
Type : Hydraulic&Manual
ID : 2"~7"
Use : Wireline &Slickline
Work Pressure : 3k 5k 10k 15k
Service : Standard&H2S
Blow out Preventer (BOP), which is connected to the top of the wellhead joint or Christmas tree. When the steel wire or cable is still downhole, closing the blowout preventer can seal around the steel wire (or cable), seal the pressure in the well, and prevent external blowout.
Model | Work Pressure | Bore | Wireline / Slickline OD. | Control Method | Remarks |
FZ6.3-35 | 35MPa | 2.5" | 0.125" | Manual/ Hydraulic | Single Ram |
2FZ6.3-35 | 35MPa | 2.5" | 7/32" | Hydraulic | Double Ram |
FZ7.6-35 | 35MPa | 3" | 0.125" | Manual/ Hydraulic | Single Ram |
2FZ7.6-35 | 35MPa | 3" | 7/32" | Hydraulic | Double Ram |
FZ10.2-35 | 35MPa | 4" | 0.125" | Manual/ Hydraulic | Single Ram |
2FZ10.2-35 | 35MPa | 4" | 7/32" | Hydraulic | Double Ram |
FZ6.3-70 | 70MPa | 2.5" | 0.125" | Hydraulic | Single Ram |
2FZ6.3-70 | 70MPa | 2.5" | 7/32" | Hydraulic | Double Ram |
FZ7.6-70 | 70MPa | 3" | 0.125" | Hydraulic | Single Ram |
2FZ7.6-70 | 70MPa | 3" | 7/32" | Hydraulic | Double Ram |
FZ10.2-70 | 70MPa | 4" | 0.125" | Hydraulic | Single Ram |
2FZ10.2-70 | 70MPa | 4" | 7/32" | Hydraulic | Double Ram |
FZ6.3-105 | 105MPa | 2.5" | 0.125" | Hydraulic | Single Ram |
2FZ6.3-105 | 105MPa | 2.5" | 7/32" | Hydraulic | Double Ram |
FZ7.6-105 | 105MPa | 3" | 0.125" | Hydraulic | Single Ram |
2FZ7.6-105 | 105MPa | 3" | 7/32" | Hydraulic | Double Ram |
FZ10.2-105 | 105MPa | 4" | 0.125" | Hydraulic | Single Ram |
2FZ10.2-105 | 105MPa | 4" | 7/32" | Hydraulic | Double Ram |
Precautions:
1. Check the inner and outer seals and O-rings of the gate in time, and replace them in time;
2. After each maintenance, a performance test (gate seal test) should be done;
3. Regular strength test and sealing test.
Welcome to contact us at any time.
![]() |
Blowout Preventer BOP Wireline Pressure Control Equipment Images |